Skip to content
Call: 07500 770 506|enquiries@cjmhltd.co.uk
Facebook
CJMH LTD Logo
  • Home
  • Heating
  • Gas
  • Plumbing
  • Boilers
  • Gallery
  • Testimonials
  • Contact

Gallery

Milton B Room 1 pic 1
Milton B Room 1 pic 1
Milton B Room 1 pic 2
Milton B Room 1 pic 2
Milton B Room 1 pic 3
Milton B Room 1 pic 3
New Bathroom and tiling throughout – Kiddlington
New Bathroom and tiling throughout – Kiddlington
Small downstairs WC transformed, hand basin, tiled floor and around the basin, mini towel rail off the CH circuit, all concealed pipe work, bespoke build (Wantage - June 2016)
Small downstairs WC transformed, hand basin, tiled floor and around the basin, mini towel rail off the CH circuit, all concealed pipe work, bespoke build (Wantage - June 2016)
New Bathroom and tiling throughout – Kiddlington
New Bathroom and tiling throughout – Kiddlington
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
210 Litre Unvented Cylinder Serving 1 x main bathroom and 1 x esuite construction). Quality showering at mains pressure (Masefield Crescent – Abingdon Sept 2014)
210 Litre Unvented Cylinder Serving 1 x main bathroom and 1 x esuite construction). Quality showering at mains pressure (Masefield Crescent – Abingdon Sept 2014)
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
Ensuite and Bathroom re-fit (Baker Road - Abingdon - April/May 2016)
New Bathroom and tiling throughout – Kiddlington
New Bathroom and tiling throughout – Kiddlington
Bespoke Medical sink installation – Dorchester On Thames (May 2014)
Bespoke Medical sink installation – Dorchester On Thames (May 2014)
Drayton Kitchen project May 2016 – Magnet Kitchen design installed by CJMH Ltd
Drayton Kitchen project May 2016 – Magnet Kitchen design installed by CJMH Ltd
New 28kw Junior WB boiler, neatly fitted in bedroom Cupboard – Southmoor June 15
New 28kw Junior WB boiler, neatly fitted in bedroom Cupboard – Southmoor June 15
Drayton Kitchen project May 2016 – Magnet Kitchen design installed by CJMH Ltd
Drayton Kitchen project May 2016 – Magnet Kitchen design installed by CJMH Ltd
210 Litre unvented with a WB system boiler, RF Comfort controls – Faringdon May 15
210 Litre unvented with a WB system boiler, RF Comfort controls – Faringdon May 15
Worcester Bosch Greenstar Condensing System Boiler 24kw (Masefield Crescent – Abingdon – Sept 2014)
Worcester Bosch Greenstar Condensing System Boiler 24kw (Masefield Crescent – Abingdon – Sept 2014)
New shower try and Tiling – Witney Jan 15
New shower try and Tiling – Witney Jan 15
Drayton Kitchen project May 2016 – Magnet Kitchen design installed by CJMH Ltd
Drayton Kitchen project May 2016 – Magnet Kitchen design installed by CJMH Ltd
By info_48og9x6g|2017-12-11T14:36:09+00:00October 10th, 2017|Comments Off on Gallery

Share This Story, Choose Your Platform!

FacebookTwitterLinkedInGoogle+Pinterest
© Copyright CJMH Ltd   |   All Rights Reserved   |   Website Design by Freedom Search Limited  07500 770506            Follow Us